Hon. Minister of Works and Housing, Mr Babatunde Fashola, SAN (left), interacting with the Unit Manager, Road Sector Development Team (RSDT) of the Ministry, Engr. Ishaq Mohammed (2nd left) , the Quality Control Officer for Section III, China Harbour Engineering Co. Ltd (CHEC), Mr. Yunusa Shittu Suleiman and others during the inspection of the ongoing dualization of the 220 Keffi - Akwanga -Lafia -Makurdi Road, Section -III : (Akwanga - Lafia - Benue State Border) in Nasarawa State on Tuesday, 21st September 2021.
HighlightPhoto NewsTrending Story

The Day in Pictures: Fashola Inspects the Ongoing Dualization of the 220Km Keffi – Akwanga – Lafia -Makurdi Road, Section III: Akwanga – Lafia in Nasarawa State

1.4k


A view of the ongoing dualization of the 220 Keffi – Akwanga -Lafia -Makurdi Road, Section -III : (Akwanga – Lafia – Benue State Border) in Nasarawa State during an inspection visit by the Hon. Minister of Works and Housing, Mr Babatunde Fashola, SAN on Tuesday, 21st September 2021.

 

Hon. Minister of Works and Housing, Mr Babatunde Fashola, SAN (left), the Managing Director, China Harbour Engineering Co. Ltd (CHEC), Mr. Wang Wen Fei (right) and others during the inspection of the ongoing dualization of the 220 Keffi – Akwanga -Lafia -Makurdi Road, Section -III : (Akwanga – Lafia – Benue State Border) in Nasarawa State on Tuesday, 21st September 2021.

 

Personnel of China Harbour Engineering Co. Ltd (CHEC) at work on a Section of the ongoing dualization of the 220 Keffi – Akwanga -Lafia -Makurdi Road, Section -III : (Akwanga – Lafia – Benue State Border) in Nasarawa State during an inspection visit by the Hon. Minister of Works and Housing, Mr Babatunde Fashola, SAN on Tuesday, 21st September 2021.

 

A view of the ongoing dualization of the 220 Keffi – Akwanga -Lafia -Makurdi Road, Section -III : (Akwanga – Lafia – Benue State Border) in Nasarawa State during an inspection visit by the Hon. Minister of Works and Housing, Mr Babatunde Fashola, SAN on Tuesday, 21st September 2021.

 

Personnel of China Harbour Engineering Co. Ltd (CHEC) at work on a Section of the ongoing dualization of the 220 Keffi – Akwanga -Lafia -Makurdi Road, Section -III : (Akwanga – Lafia – Benue State Border) in Nasarawa State during an inspection visit by the Hon. Minister of Works and Housing, Mr Babatunde Fashola, SAN on Tuesday, 21st September 2021.

Author

See also  Fashola to SERAP: 'I can't find names of alleged corrupt contractors from our record

Leave a comment

Related Articles

Lagos Tragedy: Two Dead, Warehouses Razed as Gas Tanker and Trailer Collide

A tragic gas explosion in the Ajah axis of Lagos claimed two...

Tony Elumelu Foundation disburses $100m to 24,000 young African entrepreneurs

The Tony Elumelu Foundation (TEF) has deployed $100 million in seed capital...

“A Senior Super Eagles Player Bounced Me During My 2017 Debut” – Victor Osimhen

Galatasaray and Super Eagles forward Victor Osimhen has shared a memorable anecdote...

Day 21 of War: US Signals De-escalation as Trump Eyes Exit Strategy

U.S. President Donald Trump has signaled a potential de-escalation of military operations...