The Minister of Information and Culture, Alhaji Lai Mohammed (second right); Permanent Secretary, Federal Ministry of Information and Culture, Deaconess Grace Isu-Gekpe (right) and Consultant of Messrs Blue Furniture Limited (left) when the Minister inspected ongoing rehabilitation work at the Radio House Complex in Abuja on Monday.
HighlightNews From MDA'STrending Story

FG Commences Rehabilitation of Radio House

1k
Advertisement




 

 

 

The Federal Government has commenced the first major rehabilitation of the 14-Floor Radio House Complex in Abuja since it was constructed 33 years ago at a cost of N449.5 million.

 

The contract for the rehabilitation, which will be done in phases, was awarded by the Federal Ministry of Works and Housing to Messrs Blue Furniture.

 

The Minister of Information and Culture, Alhaji Lai Mohammed, announced this on Monday in Abuja during a tour of the edifice undergoing rehabilitation.

 

He said: “Since the Radio House was built about 33 years ago, this is the first time the edifice is being given a major facelift.”

 

Mohammed said the rehabilitation work, which was supposed to be carried out in twelve weeks, was slowed down by the Coronavirus outbreak.

 

He however said with the strict observance of the COVID-19 safety protocols and the drafting of more workers to site, the contractor has assured that the project will be delivered in a few weeks time.

 

“From what I am seeing in the model, in a few weeks’ time, we are going to have a brand new Radio House.”

 

He said the contract for the rehabilitation, which will be done in phases, was awarded by the Federal Ministry of Works and Housing to Messrs Blue Furniture at a cost of N449,565,505.88.

 

The scope of the project include: demolition and alterations of aluminum roof, walls, tiles, paint and conduit pipes; Roof construction and covering using ArmorThane coating; Supply and fixing of steel doors and aluminium windows; Rehabilitation of three kones Lifts/ Elevators; Supply and installation of 30Kva Ups for Lifts and A/Cs; Removal and replacement of industrial air expellant system; General repair of toilet and plumbing work and Supply and installation of pole breakers ABB for High Tension and Low Tension Room.

See also  VP Osinbajo declares open the UN World Tourism Organization Global Conference at the National Theater.

 

Other components of the contract are: Fixing of LED corridor spotlight; Finishing of floor, wall and ceiling internally; Repainting and decorating internally; and Entrance refurbishment.

 

The Radio House Complex houses the Federal Ministry of Information and Culture; Federal Radio Corporation of Nigeria and the Voice of Nigeria.

 

The Minister was accompanied on the visit by the Permanent Secretary,Federal Ministry of Information and Culture, Deaconess Grace Isu-Gekpe, and other management staff of the ministry.

 

 

 

 

 

Author

Leave a comment

Related Articles

NDLEA Foils Ugandan Woman’s Attempt to Smuggle Cocaine Hidden in Underclothing

By Omoyeni Ojeifo From a prayer session in Lagos to a failed...

Tinubu Hails Fubara’s Maturity, Says 2027 Election Is About Nigerian Youths

By Omoyeni Ojeifo President Bola Tinubu has commended Rivers Governor Siminalayi Fubara...

Regulatory Breaches: FG Cancels All NTI 2026 Admissions

By Omoyeni Ojeifo Following breaches of admission, accreditation and university affiliation regulations,...

Tinubu in Akwa Ibom, Pledges Prosperity for Nigerians, Dismisses Opposition Rivals

President Bola Tinubu promised a better future for Nigerians during a visit...