Aregbesola and Fashola at the FEC Virtual meeting
Featured

FEC approves N122.28bn for roads, N15bn for ecological projects

374

 

 

The Federal Executive Council (FEC) has approved seven road contracts estimated at N122.28 billion out of the N137 billion projects it endorsed for the six geopolitical zones of the country.

The 5th virtual FEC meeting presided over by President Muhammadu Buhari on Wednesday, notably approved the  dualization of Akure-Ado Ekiti road connecting Ondo and Ekiti states at the sum of N23. 751 billion and the construction of Ukana-Akpautong-Ikot Ntuen road in Akwa Ibom State.
Addressing State House correspondents at the end of the meeting, the Ministers of Works and Housing and his Information and Culture counterpart, Mr Babatunde Fashola and Alhaji Lai Mohammed, said most of the projects were in the Ministry of Works and Housing, as well as the Office of the Secretary to the Government of the Federation.
Fashola disclosed that seven projects worth N122.280 billion were approved for implementation in the 2020 budget.
“The Ministry of Works and Housing presented memorandum for the award of a couple of roads across the country. There are seven roads in all. The roads were valued at a total sum of N122.280 billion expected to generate employment for about 2564 people.
“Dualization of Akure to Ado Ekiti road connecting Ondo and Ekiti states at the sum of N23. 751 billion, Construction of Ukana-Akpautong-Ikot Ntuen road in Akwa Ibom State, for N1. 538 billion, construction of Iluke-Aiyetoro Kiri-Abugi-Eggan road in Kogi State for N25.352 billion.
“Rehabilitation of Odo-Ona Elewe Idiayunre-Marou Ogun State border road in Oyo state for N4. 628, 429 billion, construction of Tamawa-Gulu road in Kano state phase three, Maigar-Guru section for N1. 508, 952 billion, rehabilitation of Potiskum-Fika-Bajoga-Gombe road linking Yobe and Gombe states for N59. 759 billion, construction of Kachako-Danbazzau road in Kano State for N6. 749 billion, ” he said.
On his part, Mohammed, presenting the report of memo by the SGF, said council approved 11 ecological projects across the six geopolitical zones of the country, at the total sum of N14. 9 billion.
“Memo presented on behalf of Mr President by the Secretary to the Government, we sought approval for the award of contract for emergency procurement of the third and fourth quarters 2019, soil erosion, flood control, acceleration intervention projects in favour of 11 contractors, in total sum of N14,907,754,845.
“The projects, which are 11 in number, are spread across the six geopolitical zones of the federation and I’ll just run through them. The first is a gulley erosion control at Ogige-Uruala-Chikabi-Ajibara in Isikwato local government area of Abia at the sum of N896,959,169.75, with completion period of six months.
“The second is erosion control and road improvement works at Ezeoke-Nsuelime, Mbaeno local government area of Imo State for the sum of N965,196,290, with the completion period of 11 months.
Then there’s a dredging of Tejuoso-NTA Canal, Railway Stadium via Alaska Estate, Surulere, which has been awarded for N1,892,006,000, with a completion period of 12 months.
“Then we have the construction of the 3 kilometre trapezoidal drain at Oluomo, Orile-Ifo by Abe-koko, at Odo-eran in Ifo local government area of Ogun State, which is for another N1, 067,051,000.
The fifth is the shoreline protection and reclamation works for Emadike Phase 2 in Bayelsa State for N4,512,019,137.
“There is also the construction of road and drainage network within Mobupolo area of Maiduguri Metropolis for the sum of N1,474,493,000. Then there’s the flood and directional control works in Gashau and Nguru local government area Phase 2 in Yobe State for the sum of N1,169,900,074,” the minister said.
He added: “The eighth is the Yaruwari-Dadi erosion control works in Safe local government area of Zamfara State for the sum of N701,313,563. Then there is the flood control and road improvement works at Nassarawa-Egon local government area, Nassarawa State for N931,754,123.
“Then there is a gulley erosion and road improvement works at FCT College of Education, Zuba, FCT, Abuja for the sum of N542,296,835. Finally there is the erosion and flood control works at the National Hospital, Central Business Area, Garki, AMAC, Abuja for the sum of N773,573,000.”

Leave a comment

Related Articles

#EndBadGovernance protests: AGF to Police: Transfer casefiles of 72 defendants to my office

The Attorney General of the Federation (AGF) and Minister of Justice, Prince...

Morocco 2025: Ekong, Aina, Simon, Ndidi, 19 others to battle Benin Republic, Rwanda

Captain William Ekong, wingback Olaoluwa Aina, and forwards Victor Osimhen and Taiwo...

Unleash the Creativity Within! [PRT 2]

So here I am with more ideas of DIY crafts for you...

Career Advancement Tips for Men

The truth that most career people avoid accepting is that advancing in...

Nigeria-British Chamber of Commerce inagurates Atelly as 18th President, unveils programmes

Ray Atelly has been sworn in as the 18th President of the...

Kano guber poll ‘clerical error’: An Appeal Court judgment in a mire of controversy

The past few months have been characterized with legal tussles over the...

Why I did not walk out of Super Falcons before FIFA female World Cup – Waldrum

In a recent podcast interview with ‘On The Whistle’ podcast. Randy Waldrum,...

Niger’s ousted president is being denied food and electricity, says European Union

The European Union Friday said it had “deep concern” about the treatment...

Breaking: Ex-Kaduna Gov. El rufai might reject ministerial appointment 

The immediate past Governor of Kaduna State, Malam Nasir El rufai is...

President Tinubu appoints Ajuri Ngelale as special adviser media & publicity

President Bola Ahmed Tinubu, GCFR, has approved the appointment of Chief Ajuri...

Are ‘balloons’ the new drug epidemic in Nigeria?

They may look like the normal balloons you see at children’s birthday...

From Fame to Penury: The Despicable Tales of Nigerian Veteran Thespians

The entertainment industry, particularly the movie circle, has been in the eye...

Content creation is the new oil, says Broda Shaggi in an exclusive interview with PSN

There are not many in the class of Samuel Animashaun Perry otherwise...

Hubby’s watery sperm, erectile dysfunction crash two-month-old marriage

A husband’s watery sperm has forced his wife to urge the court...

Max Air Acquires 16 Year Old Boeing 777-200

Kano based Max Air Limited has taken delivery of its first Boeing...

From waste collection to classroom: Story of Adamu’s pursuit of education

Coming from the background of a family of seven children and parents...

Fuel Subsidy: Need for Labour to tread softly, Softly 

The Labour Movement in Nigeria is up in arms against the Federal...

Between the dialectics and the benefits of petroleum subsidy removal

By Paul Njowusi For many years, successive administrations in Nigeria had embraced...